Believe It Or Not, Sometimes MassDEP Does Things of Which the SJC Does Not Approve

Those of us who advise clients regarding compliance with environmental regulations have often been in the awkward position of agreeing with clients that the agency position is, shall we say, misguided, yet at the same time advising against legal challenge, because the judicial review deck is stacked so heavily in favor of the agency. (In another time or place, one might ask why this is so.)

Nevertheless, occasionally, the agency loses and, when it does, that loss can be instructive. Yesterday, the Massachusetts Supreme Judicial Court ruled that MassDEP may not impose conditions on registrations under the Water Management Act without first promulgating regulations to guide its discretion in imposing such conditions.

Under the WMA, withdrawals existing as of the date of Act were grandfathered and persons with such withdrawals are allowed to maintain them by registering the withdrawal with MassDEP. Such registrations must be renewed periodically, but MassDEP may not reduce the size of the withdrawal. (New or increased withdrawals, on the other hand, require a permit and are subject to more stringent regulation.)

In the last round of registration renewals, MassDEP began imposing conditions on the registrations in order to increase water conservation. However, while the statute authorizes MassDEP to impose conditions on permits, similar language does not exist with respect to registrations. 

The SJC spent some time discussing MassDEP’s authority to promulgate regulations that would impose conservation requirements on registrants, but made clear that the plain language of the statute did not seem to authorize MassDEP to impose conditions on registrants absent regulations.

What’s the lesson here? With respect to the WMA, it’s “no shortcuts.” If MassDEP wants to impose conservation requirements on registrants, it must do so pursuant to validly promulgated regulations. What’s the broader lesson? Challenging the agency may be an uphill battle, but legislative language does matter and, where the language is clear, the courts will – at least sometimes – enforce it.

Massachusetts Releases First in the Nation Ocean Management Plan

Earlier this week, Energy & Environmental Affairs Secretary Ian Bowles announced the release of the nation’s first ocean management plan. The plan is similar, but not identical to, the draft plan issued last July. Here are the highlights

A Prohibited Area off the coast of the Cape Cod National Seashore, where most uses will be – you guessed it – prohibited

Multi-Use Areas, constituting approximately two-thirds of the planning area, where uses will be permitted if they comply with stringent standards for protecting marine resources

Renewable Energy Areas, where commercial- and community-scale wind projects have been found to be appropriate.

One significant element of the final plan, and one highlighted in Secretary Bowles’s press release, is that, where projects are proposed in areas including sensitive marine resources, it will be presumed that an alternative project outside the resource area would be less environmentally damaging. Project proponents would have to meet a balancing test, demonstrating that the project has public benefits which outweigh the detriment to the resource.

It’s going to take some time to digest the entire plan. However, most of the nation outside Houston has accepted the concept of zoning on land for almost 100 years – and land-based zoning affects private property. It’s difficult to argue with the concept that the Commonwealth should plan for resources – state waters – that it does own. In addition, having a defined framework for reviewing proposals to utilize state waters should help remove some of the uncertainty associated with the current ad hoc review that necessarily occurs in the absence of a plan. 

Deerin Babb-Brott – time to take a well-earned vacation!

EPA Issues Construction Stormwater Rule -- First National Standards With Numeric Limits

Yesterday, EPA released its effluent guidelines for construction sites. The guidelines establish the first national standard containing numeric limitations on stormwater discharges. The final standard imposed is 280 nephelometric turbidity units. It will apply to all construction sites greater than 20 acres in size as of 18 months following the effective date of the regulations (which will be 60 days after Federal Register promulgation) and sites larger than 10 acres 4 years after the effective date.

As expected, EPA did not take NRDC and Waterkeeper Alliance up on their suggestion that EPA impose post-construction controls. However, since EPA has already signaled that its long-term plan is to impose stormwater controls beyond the current universe of industry and construction sites, it seems at this point that broader stormwater regulation by EPA is more a question of when than whether.

Perhaps The Next Coastal Project Won't Take 10 Years: The First Circuit Preempts Some State Authority

Public and private developers spend a lot of time talking about NIMBY, or Not In My Backyard. With the increasing number of coastal development projects, ranging from wind farms to LNG facilities to plans for casinos, we should perhaps be talking about another acronym: NIMO, or Not In My Ocean. Yesterday, a decision from the First Circuit Court of Appeals in Weaver's Cove LNG v. Rhode Island Coastal Resources Management Council gave some hope that NIMO will not mean that states can simply squelch development of ocean resources.

Weaver’s Cove, as originally proposed in 2003, was to be an LNG terminal  located up the Taunton River, in Fall River, Massachusetts. To address safety and related concerns, the proposal has been moved off-shore.

The only element of the project that is subject to the jurisdiction of Rhode Island authorities is dredging that would be necessary in Rhode Island waters. That dredging requires a federal consistency determination by the Rhode Island Coastal Resources Management Council, or CRMC. In addition, Rhode Island state law requires that the CRMC provide a license to the project, known as an Assent. Here, the CRMC refused to provide either the federal consistency determination or the state law Assent. Weaver’s Cove LNG sued, won in the District Court, and won again yesterday at the Court of Appeals.

The facts of the case are complicated and the Court limited the decision as far as it could to the case-specific facts. Nonetheless, there are two points to be gleaned from the decision that may be of broader import

The Coastal Zone Management Act contains a provision, specifically intended to prevent states from frustrating the purposes of the CZMA, which provides that, if a state fails to act on a consistency request within six months, the state’s concurrence is “conclusively presumed.” Here, Rhode Island argued that the clock hadn’t begun to run, because Weavers’ Cove hadn’t provided all of the information necessary for CRMC to make a consistency finding. The Court didn’t buy it. Again, the facts here won’t translate to other cases, but what will transfer is the Court’s refusal simply to accept Rhode Island’s request that the Court defer to a state agency’s interpretation of its own law. Calling the CRMC’s interpretation of Rhode Island law “untenable” and “clearly erroneous,” the Court rejected it and held that, because of the CRMC’s failure to act, consistency would indeed be “conclusively presumed.”

Perhaps even more significantly, the Court concluded that the Rhode Island law which would require that the CRMC issue an Assent before the project could move forward is preempted by the Natural Gas Act (NGA). While the Court did not find that the NGA explicitly preempted Rhode Island law or that it occupied the field, it did conclude that, in this case, state law conflicted with the NGA. 

Notwithstanding the Court’s efforts to limit its preemption holding, I think it will provide grist for preemption arguments in other cases, as will its reluctance to defer to state agency interpretation of state law, where such deference might create obstacles to the accomplishment of federal objectives.

It’s too much to say that this decision represents the end of NIMO. However, it’s also difficult to see this as totally abstracted from an awareness by the Court of the delays experienced by the Cape Wind project. We’ve got to figure out a way to get to an answer more quickly. The answer my be “no” to some projects, but it shouldn’t take six years to get an answer.

Another Bullet Aimed at Coal; Another Argument For Multi-pollutant and Multi-media regulation

On Tuesday, EPA announced its intention to issue new effluent guidelines for the Steam Electric Power Generating industry by sometime in 2012. The announcement follows an EPA study in 2008 which indicated that toxic metals, particularly those collected as part of flue gas desulfurization processes, can pose a problem in facility effluent. EPA’s announcement is not particularly surprising, given the ongoing study and given that EPA has not revised the guidelines since 1982. Indeed, notwithstanding EPA’s announcement, Environmental Integrity Project, Defenders of Wildlife and Sierra Club announced that they would still sue EPA over its failure to timely update the guidelines.

There are two reasons why this announcement is significant beyond just its implications for effluent discharges from these facilities. First, it’s hard to see EPA’s announcement – and the threat of NGO litigation – as anything other than another bullet aimed squarely at the coal industry. From climate change, to attacks on mountaintop removal, to the reaction to the TVA spill, to this effort to make the effluent guidelines more stringent, there is no doubt that coal is in the cross-hairs at the moment. If there are any doubters concerning this point, Duke Energy CEO Jim Rogers isn’t among them. He was quoted in this morning’s Energy & Environment Daily as saying that it is at least possible to envision a world in 2050 “where coal is not in the equation.”

The other reason why this announcement is significant is that it raises fairly squarely the question regarding the very structure of our current regulatory system.  It’s not really any more than happenstance and political convenience that we regulate different environmental media differently. In this context, it is noteworthy that EPA’s Science Advisory Board just recommended that EPA consider setting multi-pollutant standards under the Clean Air Act, rather than regulating each pollutant separately. Theoretically, that’s good as far as it goes, but it doesn’t really solve the problem of the balkanization of EPA’s different regulatory programs.  In the long run, EPA’s regulatory efforts would be much more cost-effective – and would probably garner much more public support – if they were rationally based on an overall assessment of risk, across pollutants and across media.

I’m not holding my breath.

Is it Good News or Bad? MassDEP Wins an Adjudicatory Hearing Appeal

Although not breaking any new ground, a decision from the Massachusetts Appeals Court last week provides a helpful summary of the discretion typically given to MassDEP in making permitting decisions. In Healer v. Department of Environmental Protection, abutters to a proposed wastewater treatment facility in Falmouth sued MassDEP, claiming that the groundwater discharge from the leach field associated with the facility would damage drinking water supplies and nearby wetlands. The Court affirmed the MassDEP Commissioner’s rejection of the abutters’ challenge.

As the Court noted

the “applicable standard of review is “highly deferential to the agency” and requires the reviewing court to accord “due weight to the experience, technical competence, and specialized knowledge of the agency, as well as to the discretionary authority conferred upon it…. We give deference to the decision of an agency interpreting its own regulations … [and] do not intrude lightly within the agency’s area of expertise, as long as the regulations are interpreted with reference to their purpose and to the purpose and design of the controlling statute.”

As if that were not enough of a nod towards agency deference, the Court also noted, in the context of the plaintiffs’’ challenge to the monitoring requirements imposed in the permit, that

The Legislature “has chosen to put into the hands of an expert administrative agency the decision making regarding complex issues of environmental … science…, and has allowed the agency considerable discretion in determining monitoring of applicable parameters in order to carry out its duty….

Finally, the Court made at least one statement about the plaintiffs’ affirmative case that is sure to be cited by MassDEP and permittees in future citizen suits. In rejecting the plaintiffs’ argument that toxic household chemicals might cause environmental damage, the Court stated that the “regulations do not require the department to establish permit conditions based on the plaintiffs’ speculative concerns.”

So, what’s the upshot of Healer? It certainly confirms that, as a general matter, courts are not going to reverse agency decisions unless they seem really off-the-wall.  On the other hand, it remains true that MassDEP does not always win and my own jaded view is that courts remain willing to reverse MassDEP, even when deference would require that the court affirm the agency, if the agency decision somehow rubs the court the wrong way.

Stormwater Discharges From Construction Activity: What Next From EPA?

Construction and development companies praying for an economic recovery next year have something else to worry about: pending new EPA regulations regarding stormwater discharges from construction activities – and claims from environmental groups that EPA’s proposal isn’t stringent enough.

EPA issued a proposal on November 28, 2008. That proposal is complex, but the aspect of it that has received the most attention is the requirement that certain construction sites greater than 30 acres meet numerical turbidity limits (specifically, 13 nephelometric turbidity units (NTUs), which I had to include in this post just because it sounds so cool). Developers have opposed the numeric limits; the National Association of Home Builders estimates that the cost to comply would be $15,000 to $45,000 per acre.

On the other hand, the NRDC and Waterkeeper Alliance have threatened to sue EPA if EPA does not revise the propose rule to include post-construction controls as part of the rule. EPA has stated that it is not planning to do so. It’s not obvious that NRDC and Waterkeeper Alliance have the better of this specific debate, but the argument regarding post-construction controls is similar to the ongoing discussion in Massachusetts and elsewhere regarding the need for ongoing stormwater controls at properties other than industrial facilities that are already regulated.

The issue is not going to go away.  EPA is under a deadline to issue the rule by December 1, 2009.

Ocean Zoning Gets Off the Ground in Massachusetts

This week, the Massachusetts Executive Office of Environmental Affairs announced release of the draft Ocean Management Plan, developed pursuant to the Oceans Act of 2008. The draft Plan has gotten most press for its identification of specific areas for off-shore wind energy development – as well as its prohibition of wind farms in other areas, including the area of the proposed Buzzards Bay wind farm. EOEEA Secretary Ian Bowles was quoted as saying that Buzzards Bay is too crowded and sensitive for the development of large-scale wind farms.

The Plan is about much more than wind farms, however. It really is zoning brought off-shore. There are areas where certain uses are prohibited, areas in which uses are encouraged, and other areas that will be subject to performance standards to determine whether specific uses should be allowed. Where uses are at least conceptually allowed, there will be provisions to protect sensitive areas, including a provision that requires proponents of uses in such areas to “avoid, or demonstrate that there is no less damaging practicable alternative, or demonstrate that data does not accurately characterize the resource or use.”

The Plan is important for several reasons:

The breadth of its application

The effort to integrate ocean planning with the Commonwealth’s climate change agenda

Its potential precedential effect on other states and nascent federal ocean zoning efforts

Public hearings on the Plan will be held in September, though they have not yet been scheduled. Even in advance of the hearings, comments on the Plan can be submitted here. The schedule calls for the final Plan to be issued by December 31, 2009.

Sustainable Stormwater Management: The Next Wave in Water Pollution Regulations?

As we previously noted, last fall Massachusetts proposed sweeping new regulations designed to reduce phosphorus discharges in stormwater. In response to a very large number of comments, MassDEP is taking a second look at the regulations, though the bookies in Las Vegas are laying odds against there being any significant changes made when the regulations reappear.

Now Maryland is also getting into the act, although it is taking a slightly different approach. Under a statute enacted in 2007, developers in Maryland must incorporate the concept of “environmental site design” into their plans. ESD means

using small-scale stormwater management practices, nonstructural techniques, and better site planning to mimic natural hydrologic runoff characteristics and minimize the impact of land development on water resources.

The Maryland statute will be enforced by counties and municipalities. Therefore, the Maryland Department of the Environment has released a Model Stormwater Management Ordinance for use by local governments in implementing the statute.

As one of the contentious issues in the Massachusetts debate has been when redevelopment would subject a property to the requirements of the regulations, it is notable that the Maryland ordinance defines redevelopment as

any construction, alteration, or improvement performed on sites where existing land use is commercial, industrial, institutional, or multifamily residential and existing site impervious area exceeds 40 percent. [Emphasis added.]

To that, I can only say, uh-oh.

One final note on stormwater – Oregon just enacted legislation limiting the phosphorus content of certain soaps.  This is not significant in its own right. However, in Massachusetts, many of the comments from developers and industrial interests noted that the types of stormwater controls proposed by MassDEP may not be the most cost-effective way to reduce nutrient loading to water bodies, and specifically suggested that programs targeted at consumers using products containing nutrients might be a better way to attack the problem in the first instance.

Next on the Federal Agenda: Ocean Zoning

I know it’s hard to believe, but some of you may not have realized that today is World Oceans Day. In connection with World Oceans Day, Senator Jay Rockefeller has written a letter to the White House in support of the concept of “ocean zoning.” Senator Rockefeller will also be holding hearings on the issue tomorrow. Among those testifying will be Deerin Babb-Brott, who is the Assistant Secretary in the Massachusetts Executive Office of Environmental Affairs and is in charge of Massachusetts’ first in the nation ocean zoning effort.

The Massachusetts effort is based on the Oceans Act of 2008, which called for development of a comprehensive ocean management plan. In other words, ocean zoning. Since enactment of the Act, EOEEA has been working on developing the required plan, with assistance from the Ocean Advisory Commission, which was created by the Act to help guide EOEEA’s development of the plan. The plan has yet to issue and, based on recent documents from EOEEA, it may be some time before the final plan sees the light of day.

Notwithstanding the complexities of the issue – or perhaps because of them – Senator Rockefeller apparently believes that federal ocean zoning would be appropriate. He may be right. Issues such as renewable energy and deepwater aquaculture may be of local concern, but do we really want a patchwork of local laws and regulations dictating policy on issues of broad national concern?  If we go that route, it won’t be very long before there is a yet more complicated set of exemptions and preemptions.

I’m sure that Deerin will not be advocating federal preemption of local ocean zoning efforts, but there is a part of me that hopes that Deerin’s testimony is so effective that he talks himself out of a job.

One Step Closer to a Legislative Fix to Rapanos?

Particularly this week, one needs to make a conscious effort to remember that it is not “all climate, all the time” on the environmental front. While climate change is obviously the President’s top priority at the moment, the administration did take the time this week to send letters to congressional leaders voicing the its support for amendments to the Clean Water Act to eliminate uncertainty concerning the Act’s scope following the Supreme Court decision in Rapanos

While the administration has not provided suggested statutory revisions, the letters state that: “It is essential that the Clean Water Act provide broad protection of the nation's waters, consistent with full congressional authority under the Constitution.” This suggests that the administration might look kindly on the simple fix proposed under the Clean Water Restoration Act, , S. 787, which would basically just substitute “waters of the United States” for “navigable waters of the United States” wherever it appears in the Act.

There is no doubt that such legislation would reduce uncertainty regarding the scope of the CWA, which is unambiguously a good thing.  Whether there is a way to reduce uncertainty without expanding the scope of the Act’s jurisdiction to the full scope permitted under the Constitution, and whether such an expansion would be wise policy, are questions that neither the administration nor congressional Democrats appear to be asking at this point.

Be Careful What the EPA Administrator Wishes For: Is a Legislative Fix to Rapanos on the Horizon?

In an statement this week likely to send chills down the spine of developers, EPA Administrator Jackson called on Congress to provide a clearer definition of wetlands subject to permitting authority under the Clean Water Act. As most readers know, the 2006 Supreme Court decision in Rapanos v. United States narrowed the scope of regulatory jurisdiction over wetlands. Unfortunately, the absence of a majority decision in Rapanos means that, at this point, no one knows quite how much narrower. I think that most observers at least triangulate around Justice Kennedy’s concurring opinion, which stated that waters or wetlands with a “significant nexus” to waters that are navigable in fact should be subject to regulation. However, uncertainty abounds.

Uncertainty imposes significant costs on regulated entities (not to mention EPA and the Army Corps of Engineers). Therefore, a statutory fix that simply eliminated uncertainty would probably be welcomed by the regulated community. Of course, the devil is in the details. If the uncertainty is eliminated by subjecting any land that is ever wet to the CWA, such legislation would probably not be welcomed by developers.  Jackson’s statement that “I believe that the country benefits from something broader rather than narrower” is not likely to assuage developers’ concerns.

Time will tell whether compromise is possible in order to eliminate uncertainty that benefits no one.

Justice Triumphs: The Supreme Court Upholds EPA's Authority to Consider Costs Under Section 316(b) of the Clean Water Act

As many readers of this blog will have already learned, the Supreme Court issued its long-awaited decision in Entergy v. Riverkeeper yesterday. The Court reversed the Second Circuit Court of Appeals and held that EPA was within its authority to consider cost-benefit analysis in setting standards for cooling water intake structures under § 316(b) of the Clean Water Act.

I’m definitely getting on my soapbox here, but this should not be news and it should not be controversial – though I certainly realize that it is. If current conditions tell us anything, it is that resources are not infinite. The irony here is that it is environmentalists who tend to make this point most frequently. Unfortunately, they don’t like to acknowledge that, because resources are not infinite, cost-benefit decisions get made implicitly, even when EPA does not utilize cost-benefit analysis in its regulations.

When I was just a poor Superfund lawyer, I attended a public meeting in Somersworth, New Hampshire, as local residents tried in vain to persuade EPA that they could save more lives by installing traffic signals and hiring public safety personnel than by spending millions of dollars cleaning up an old landfill to the nth degree. The simple truth is that when we force regulated industries to incur costs without regard to the associated benefits, other spending gets displaced. It may be better to have power plant owners spend money on closed cycle cooling than on worker health benefits or, God forbid, payments to shareholders, but let’s make the decision honestly and not ignore the trade-offs.

I still don’t understand why the debate can’t be about how fairly to define costs and benefits. There are serious issues here, but there’s certainly no free lunch. I posted recently about my disappointment regarding early indications that the Obama administration will not be a friend to common sense regulatory reform. The same issues arise here. The Obama administration, because of its undoubted credibility, could advance the cause of cost-benefit analysis and cost-effectiveness analysis. I fear it is not going to happen.

For the same reason, it’s quite possible that the Riverkeeper decision may be much ado about nothing. Riverkeeper holds that EPA may consider costs and benefits, but does not require it. Environmentalists are already clamoring for EPA to rewrite the 316(b) rules and I wouldn’t be surprised if the agency does so.

More News From the Coal Front: Mountaintop Mining Takes One Hit -- and May Face Another

This week, the practice of mountaintop removal – chopping the tops off mountains in order extract the coal – received two blows: one from EPA and one from Congress. First, EPA offices Region 3 and Region 4 announced that they plans to assess the Central Appalachia Mining's Big Branch project in Pike County, Ky., and the Highland Mining Company's Reylas mine in Logan County, W.Va., before permits are issued for those projects. 

Although the broad brush is important here, so are some of the details. First, both letters raise concerns about the cumulative impacts of multiple mountaintop removal projects. Second, the Region 3 letter raises the possibility that EPA might use its authority under section 404(c) of the Clean Water Act to prohibit issuance of the required permit, noting that the “extensive cumulative and other impacts give this proposed project high potential” for action under § 404(c).  

The second blow was the introduction in Congress of legislation that would prohibit mountaintop removal. Of course, introduction doesn’t guarantee passage, but it does seem notable that one of the two sponsors is Lamar Alexander, both a Republican and a Senator from a coal mining state. Senator Alexander’s support suggests that a tipping point may have been reached on this issue.

EPA and Maine DEP Announce New Stormwater Controls

Demonstrating that the recent announcement of new stormwater controls for the Charles River in Massachusetts were not an aberration, EPA, joining with the Maine DEP, announced last Friday that it will be imposing new stormwater regulations for discharges into Long Creek, which ultimately flows into Casco Bay.

Responding to petitions from the Conservation Law Foundation, EPA has exercised its Residual Designation Authority under its NPDES permitting regulations.

The new designation can be found on EPA’s website. Notably, the new program will apply to impervious surfaces larger than one acre. This is a smaller area than is currently proposed for the Charles River. EPA estimates that regulating impervious surfaces one acre and up will place 90% of all impervious area in the Long Creek watershed under NPDES jurisdiction.

Owners of properties in other degraded watersheds, you may be next on the list.

It's Not All About Climate Change: Massachusetts DEP Proposes New Stormwater Permitting Regime

Although some of you may think that the regulatory agencies are now all climate change all the time, Massachusetts DEP has demonstrated that there is still life in some more traditional aspects of environmental regulation. MassDEP has just proposed sweeping new stormwater regulations that would go far beyond the traditional EPA model of regulating construction sites and stormwater discharges from industrial facilities.

DEP’s proposal is far too detailed for a blog post. For those interested in this issue, take a look at the client alert we issued, which hits the big issues. One big-picture item to note: There certainly seems to be something of a competition brewing between EPA and DEP regarding regulations of stormwater. 

Anyone who has at least 5 – and perhaps at least 2 – acres of impervious surface should certainly consider commenting on the regulations when they are formally issued for public comment.

EPA Issues New Industrial Stormwater Permit

On September 22, EPA issued a new Stormwater Multi-Sector General Permit (MSGP) to cover 4,100 facilities with discharges associated with an industrial activity. The permit replaces the MSGP that was issued in 2000 and expired in October 2005. The expired permit continued to be valid for facilities that were covered by the permit at the time it expired.

The new permit applies to states not authorized to implement EPA’s NPDES program, including Massachusetts and New Hampshire. It will be effective as of September 29, 2008.

Although EPA claims of regulatory reform sometimes ring hollow, the new MSGP truly does seem to be an improvement over the prior MSGP for industrial facilities. One significant improvement is that permit now separates technical requirements for effluent limitations from the requirement to prepare and implement stormwater pollution prevention plans (SWPPP). Importantly, EPA has clarified that a SWPPP is not an effluent limitation. Therefore, industrial facilities may amend SWPPP without EPA approval. More important, because the SWPPP is not an effluent limitation, noncompliance with the SWPPP will not subject a permittee to claims that he/she has violated an effluent limitation (though noncompliance with a SWPPP may be a violation of a record-keeping requirement).

EPA has also significantly streamlined its filing and compliance systems. First, notice of intent to be covered by the MSGP may be made electronically, through a new “eNOI” system. Second, EPA has created a “Water Locator” tool, which will enable facilities to obtained certain relevant information, such as applicable total maximum daily loads, or TMDLs, on-line. Facilities will also be able to provide required monitoring data on-line.

In short, while the new permit may not eliminate any substantive complaints that industrial facilities may have with EPA’s stormwater program, it should reduce transaction costs associated with compliance.